SERVICEThe current location :HOME > SERVICE
German VDE certification

VDE directly participates in the formulation of German national standards, and is one of the most experienced and highly respected certification bodies in the world. It has completed a total of 18000 certification projects for nearly 2200 German companies and 2700 clients in other countries each year. By the end of the day, 200 thousand electrical products from nearly 50 countries worldwide have received VDE marks.
In our country, the direction of diversification of the export of electrical products, made in Europe, Australia, Southeast Asia and other regions have put importers such as GS (Germany), BEAB (UK), IMQ (Italy) and other safety certification and CE mark requirements. Most of the plants in the process of authentication and the requirements of their electrical safety requirements break up the whole into parts, spare parts suppliers to secure a high level of safety certification mark, which is more and more parts production enterprises hope to obtain VDE mark promoting reason.

 Product range
Household Electric Appliances
Lamps, LED and luminaire parts
Consumer electronics and IT products
Power tools and garden tools
Medical apparatus and instruments
Toys
Battery
Photovoltaic technology
fuel cell
Electric vehicles, automotive electronics
smart meter
Wire and cable
Electronic components
Transformer and switching power supply
Installation technology
More......
Service area
Safety
electromagnetic compatibility
Chemical test and analysis
Practical test
Product life / reliability test
Life cycle analysis, energy efficiency testing
Acoustics / noise test
Insulation materials and environmental testing
Software evaluation
VDE intelligence manual
Factory audit
Inspection Service
Quality management system audit
International certification service
Training and technical support services


Authentication process
1 submit formal application form Form19 and structural parameter list --- important document of applying for VDE,
2 apply for confirmation of receipt of formal application form and structure parameter form by ---VDE, and send invoices, factory inspection questionnaire and other information.
3 when the sample delivery ---VDE application is confirmed, the specific delivery requirements and the relevant standards on which the tests are based will be informed. After the sample has been completed, it must be tested according to the standard requirements or sent to the relevant domestic laboratory for prediction. The sample can be sent to the VDE safely and accurately by ems.
1) once the test items are all passed, the applicant will be notified at the first time.
2) the inspection result may also have the flaw. Some light defects, certification bodies and VDE communication, as long as a little correction, do not have to re send samples, VDE that is able to issue.
3) when the inspection result has the important flaw, the authentication organization will discuss with the applicant the reason for the defeat. If necessary, please send VDE samples of failed samples for reference and analysis. After the sample has been modified and completed, the re inspection procedures should be carried out. If the sample is re sent within six months, the cost of the new test will be greatly reduced.
4 VDE Globle Service Branch such as Suzhou, Guangzhou branch, to provide pre service, improve the pass rate of test.
5 factory inspection - Review and inspection of the factory before and after the issuance of the certificate, or regular or unscheduled review. Prior to the factory examination, the Certification Authority appoints experts to assist the manufacturing plant in controlling the production facilities, laboratory equipment, measurement and the whole quality system, and the VDE requires self inspection. Assist the manufacturer to discuss the corrective actions as soon as possible and implement them promptly until they are re examined.
6 issue permits - VDE will notify the applicant promptly if the sample test is passed and the VDE certificate will be issued shortly if the sample test is passed.
Submit information
1. product description
2. model specification
3. circuit diagram
4. German manual
5. list of parts and materials
6. CB test report
7. other required materials

Factory review
(1) Factory review before certification;
Prior to certification, the factory review is to verify the production of certified products to achieve the desired production results. For initial applications, if the manufacturer's production facilities have not been reviewed before, the manufacturer must carry out a factory inspection before obtaining the certificate. The certification authority distributes questionnaires to applicants (table CIG, 022, part B), and the manufacturer shall fill out the questionnaire. The questionnaires included for some of the problems in the enterprise application, such as address, contact person, number of employees, products, materials, components and other products has become a part of the component, the quality system of the enterprise information, what are the factory test etc.. The VDE Factory review department will evaluate the product as soon as it receives the questionnaire and contact the manufacturer to schedule a review of the factory before the certification is made. The VDE may accept the review if the other CCA agencies have conducted factory audits of the relevant categories and the manufacturer submitted the relevant review reports to the VDE audit.
(2) Factory review after obtaining the certificate;
VDE, in principle, two factory reviews a year. The factory review mainly examines the consistency of products and samples, but also examines quality management documents such as inspection procedures, records, measurements, and so on.
Get
Generally speaking, there are two ways to carry out type approval of VDE certification: the first method is to consult and complete the application procedure directly to the VDE, and follow the VDE Test Engineer
For a considerable number of test samples mailed to Germany, the German VDE standard test according to the item by item, and according to the total time spent workload VDE test according to German engineers pay full price inspection fee. The second way is that enterprises first put forward the application of "CB test" to the CB laboratory which has good cooperation with VDE at home, and then pass the CB test report to the type test report of VDE certification. We know that the CB test certificate is the International Electrotechnical Commission electrical product safety certification organization (IECEE) Certification Commission (CCB) to develop a unified, from within a country is a certificate issued by the certification body recognized by IECEE-CCN (in China, CCEE is the CB test certificate, certification units) certification and test report attached to the notice of other countries, some electrical products samples have been in accordance with the unified IEC standard and passed the test. The world has joined the CB system by more than 30 countries, and VDE is also a CB member laboratory, so the CB test report issued by us can basically be accepted directly, so the test of the main items can be completed in china. Only if there are individual differences of national experimental projects such as Germany's DIN standard and IEC standard when the VDE engineer will notify the agent, send the individual samples added differences between the experimental project, then the comprehensive test results to confirm.
Comparison of two methods, it is not difficult to see that the first way for VDE because it is outside the test of the experiment and the understanding of enterprise is more difficult, and at one time by the possibility of detection of VDE are relatively small, so the need for reciprocating contact, repeatedly sending samples to the outside, the project period is difficult to control. In addition, VDE German technical personnel unit labor costs are much higher than domestic technical personnel, so the total cost may be relatively high. The second way is divided into domestic and foreign testing seems to supplement the two stage, is actually using the domestic local inspection station relative familiar with the product state of technology advantage, and found that the problem of timely communication is improved, and the domestic and foreign artificial price difference and other favorable conditions. Through the operation of some practical projects, it has been proved that using CB test report to bid for VDE certification can be regarded as a time-saving and economical shortcut.

Copyright © 2016 Tianjin Huantong Detection Technology Co., Ltd.
All Right Reserved
Hotline: 022-84819220 / Mr Meng:17702298445 / Mr Huang:18920860163
Fax: 022-84819220 / E-mail: huangxin002@tj-gts.com
Address: 8F, Building 2, Building 6, Ronghe Plaza, 168 West Fourth Road, Tianjin Free Trade Zone (Tianjin Economic Zone)
 孟工  黄工